Week 5 - Now / Next / Later

Updated Mar 30, 2026

Universe: 52 U.S. metros with qualifying catalyst activity Scoring: Hero × Progress composite (0–10) Tier boundaries: NOW 7.5–10.0 / NEXT 5.5–7.4 / LATER 3.5–5.4 / FUNNEL <3.5

NOW

7.5–10.0 - Deploy capital within 90 days

ScoreMetroCapital Investor$$Hero Catalyst
5.46San Antonio, TXToyota$531MToyota $531M EV battery expansion (operational)
4.9Lehigh Valley, PAEli LillyTBDEli Lilly manufacturing (announced Jan 2025) — greenfield, no existing pharma workforce
4.9Allentown, PAEli Lilly$1.8BEli Lilly $1.8B pharmaceutical manufacturing — construction underway
4.5Nashville, TNHCA Healthcare$2.5B+HCA Healthcare HQ anchor; Oracle groundbreaking still not started; Ford Blue Oval delayed to 2029
4.5Wilmington, NCThermo Fisher Scientific$500M+Thermo Fisher Scientific (2,500 jobs; biotech manufacturing)

NEXT

5.5–7.4 - Underwrite now, set trigger

ScoreMetroCapital Investor$$Hero Catalyst
7.1West Lafayette, INSK hynix$3.87BSK hynix HBM semiconductor packaging — $458M CHIPS + $500M loan; 1,000 direct / 7,000 total; under construction
6.0Kansas City, MOPanasonic$7B+Panasonic EV battery $4B (4,000 jobs; OPERATIONAL Jul 2025); Honeywell KCNSC expansion (4,000 jobs; under construction)
5.95Boise, IDMicron Technology$2B+Micron Technology existing fab (OPERATIONAL; 5,000+ jobs; expansion cycles)
5.7Tulsa, OKEGA / Century Aluminum$4BEGA/Century Aluminum $4B aluminum smelter — 1,000 jobs; Inola, Tulsa MSA
5.5St. Louis, MOBoeing$2B+NGA Next $1.7B government campus (operational <18 months)
5.5Knoxville, TNOak Ridge$500M+Oak Ridge nuclear/advanced manufacturing expansion (ongoing)

LATER

3.5–5.4 - Monitor quarterly - Top 5 only

ScoreMetroCapital Investor$$Hero Catalyst
5.46San Antonio, TXToyota$531MToyota $531M EV battery expansion (operational)
4.9Lehigh Valley, PAEli LillyTBDEli Lilly manufacturing (announced Jan 2025) — greenfield, no existing pharma workforce
4.9Allentown, PAEli Lilly$1.8BEli Lilly $1.8B pharmaceutical manufacturing — construction underway
4.5Nashville, TNHCA Healthcare$2.5B+HCA Healthcare HQ anchor; Oracle groundbreaking still not started; Ford Blue Oval delayed to 2029
4.5Wilmington, NCThermo Fisher Scientific$500M+Thermo Fisher Scientific (2,500 jobs; biotech manufacturing)

Signals to Watch

⚠ Memphis, TN (LATER 3.6) - Major employer job cuts confirmed in 2026. No stage change yet, but the FedEx anchor thesis warrants closer monitoring. Score under review.

⚠ Richmond, VA (FUNNEL 2.7) — Meta layoffs and metaverse pivot creating uncertainty around the $800M data center investment. Data center jobs are already thin; workforce disruption compounds the weak thesis. Watch for further cuts.

↑ Syracuse, NY (LATER 4.2) — Second Micron business park greenlit; South Korean supplier committing to Clay. No physical stage change yet, but the ecosystem is building around the fab ahead of schedule. Positive signal for the 2030 timeline.

↑ San Diego, CA (FUNNEL 3.4) — Anduril's Long Beach campus moved to pre-operational this week (progress 0.50 → 0.85). Entered the board as a new Funnel entry. Worth tracking as operations ramp.

Scoring universe: 52 U.S. metros with qualifying catalyst activity as of Mar 30, 2026 Hero × Progress framework. Not investment advice.