We don't cover Allentown yet.
Cap Rate Signals tracks ~130 metros with confirmed catalyst investment. Coming soon — request research on uncovered cities.
Related markets we do cover
NOW7.74
Sherman, TX.
Texas Instruments' SM1 fab began production in December 2025 — the first of up to four fabs on a $40B mega-site (reframed from initial $30B 2021 commitment) dropped into a city of 53,000 with no
Texas Instruments $40B fab (up to 3,000 jobs; Sherman site reframed Jun 2025 from initial
Cap
5.5-6.5% (2024)
Vac
7-9% (2024)
Entry
$180K–$240K
EXCLUDED1.40
Dallas, TX.
DPA project is R&D only ($10M)
UT Dallas ESSC $10M DPA (battery materials R&D)
Cap
4.5-5.0%
Vac
~9%
Entry
—
