Weekly board·By Erik P.

Week 12 - Now / Next / Later

Updated Jun 1, 2026

Universe: 107 U.S. metros with qualifying catalyst activity Scoring: Hero x Progress composite (0-10) Tier boundaries: NOW 7.5-10.0 / NEXT 5.5-7.4 / LATER 3.5-5.4 / FUNNEL <3.5

NOW

7.5-10.0 - Deploy capital within 90 days

ScoreMetroCapital Investor$$Hero Catalyst
7.74Sherman, TXTexas Instruments$40BTexas Instruments fab $40B (Sherman site reframed Jun 2025 from initial $30B 2021 commitment; 4 fabs over multi-decade buildout; part of TI's $60B+ system-wide US plan)
7.22Taylor, TXSamsung Electronics$17B+Samsung $17B semiconductor fab (equipment installation phase, 2nm node)

NEXT

5.5-7.4 - Underwrite now, set trigger

ScoreMetroCapital Investor$$Hero Catalyst
6.99Indianapolis, INEli Lilly$20B+Eli Lilly diabetes/obesity mfg $17.5B+ (2,800+ jobs; +$4.5B LEAP add May 2026)
5.95Boise, IDMicron Technology$2B+Micron Technology fab expansion ~$50B (~17K jobs total; ID1 first wafer mid-2027)
5.70Tulsa, OKCentury Aluminum/EGA$10B+Century Aluminum/EGA $4B smelter (1,000 jobs; announced 2024-25)
5.64West Lafayette, INSK hynix$3.87BSK hynix HBM packaging $4.83B ($458M CHIPS + $500M loan + project capex) (1,000 direct / 7,000 total; under construction)
5.50Knoxville, TNOak Ridge$500M+Oak Ridge nuclear/advanced manufacturing expansion (ongoing)

LATER

3.5-5.4 - Monitor quarterly - Top 5 only

ScoreMetroCapital Investor$$Hero Catalyst
5.43Lehigh Valley, PAEli Lillyumbrella $27B/4-site (per-site not separately disclosed)Eli Lilly retatrutide / GLP-1 manufacturing — 4th of Lilly's Feb 2025 $27B / 4-site umbrella, LV site named Jan 30, 2026 at joint Shapiro/Lilly event (per-site investment not separately disclosed; ~925K sq ft across 7 buildings on 150 acres at 9802 Main St, Fogelsville; construction underway May 2026)
5.40Columbus, OHAnduril / Honda / Amazon$25B+Intel semiconductor fab $20B (3,000+ direct; under construction)
5.40Palm Bay, FLL3Harris Technologies$100ML3Harris $100M satellite integration facility (operational)
5.33Kansas City, MO/KSPanasonic$7B+Panasonic EV battery $4B (4,000 jobs; OPERATIONAL Jul 2025)
5.12Syracuse, NYMicron$100BMicron Technology semiconductor fab $100B ($6.2B CHIPS + $5.5B NY State) (9,000 direct / 50,000 total)

Signals to Watch

Data refresh — bigger numbers, no movement — Quiet board this week: no tier moves, no score deltas above the 0.30 threshold. But four catalyst descriptions got materially upgraded in the underlying data. Sherman, TX: TI's commitment reframed from $30B to $40B, now described as 4 fabs over a multi-decade buildout (part of TI's $60B+ U.S. system). Boise, ID: Micron's footprint clarified to ~$50B with ~17K jobs total, ID1 first wafer mid-2027. Tulsa, OK: Century Aluminum/EGA smelter scaled from $1.1B to $4B. West Lafayette, IN: SK hynix HBM packaging total raised from $3.87B to $4.83B with project capex included. These are bigger numbers attached to the same scores — the Hero × Progress math reads the same. Worth noting as ground truth on capital scale.


Scoring universe: 107 U.S. metros with qualifying catalyst activity as of Jun 1, 2026 Hero x Progress framework. Not investment advice.